Choosing an Agreed Surveyor - The Questions an Adjoining owner Should ask

The Surveyor you select should be comfortable answering these type of questions than simply asking for an appointment. Once you have selected a Surveyor the appointment cannot be rescinded 

If you were to act as an Agreed Surveyor, how would you summarise your role in the project?

My role is not to represent either owner. Under the Party Wall etc. Act 1996, once appointed as an Agreed Surveyor, I owe a statutory duty to act impartially.

​

My responsibility is to consider whether the proposed works fall within the Act, whether they can reasonably proceed, and what protections are appropriate for both owners. The Award is intended to facilitate the works while protecting the adjoining owner's property and recording the rights and obligations of each party.

​

The role is therefore one of independent professional judgement rather than advocacy for either side.

What steps would you take to satisfy yourself that the proposed works can be carried out without creating unnecessary risk to our adjoining property, and that any aspects of the proposal affecting the shared structural aspects have been fully considered?

I would review the proposals in sufficient detail to understand how the works interact with the party wall and adjoining structures.

​

That would typically include considering:

  • the architectural drawings;

  • any structural details relevant to the notifiable works;

  • the sequence of construction where it affects adjoining property;

  • access requirements;

  • temporary support arrangements where relevant;

  • and any particular features of the adjoining property that may influence the works.

​

​

My objective is not to redesign the project but to satisfy myself that the proposals have been properly considered and that the Award contains appropriate safeguards.

​

Where I believe additional information is required before I can properly discharge my duties, I would request it before preparing the Award.

​

Specifically, would you expect to review a structural engineer's drawings and calculations before preparing the Award?

Usually, yes—but not in every case.

​

Where the proposed works involve structural alterations, steelwork, cutting into the party wall, substantial excavations or other works affecting structural stability, I would normally expect to review the structural engineer's drawings.

​

Whether I review detailed calculations depends on the nature of the project.

​

As a Party Wall Surveyor, I'm not checking the engineer's design in the way a structural checker would. My purpose is to understand how the structural proposals affect the adjoining property so that appropriate provisions can be included within the Award.

​

If aspects of the structural proposals remain unclear, I would normally seek clarification before the Award is made.

At what stages would you expect to interact with us during the process, and when would we have the opportunity to comment or raise any concerns?

Typically I would expect to:

​

  • discuss the proposed works once appointed;

  • inspect the adjoining property before works commence and prepare a Schedule of Condition;

  • consider any concerns you raise before the Award is finalised;;remain available during the works if issues arise;

  • deal with any allegations of damage or disputes relating to the Award.

​

Communication should continue throughout the project where necessary.

If damage occurs or we have concerns that arise during the works, what protection does an Award provide to us and what would your role be if you are working as an Agreed Surveyor?

The Award provides a framework for resolving those issues.

​

The Schedule of Condition establishes the pre-existing condition of the adjoining property. If damage is alleged during the works, that record assists in determining whether the damage is attributable to the notified works.

​

As Agreed Surveyor, I would investigate any reported damage impartially. If I concluded that damage had resulted from the works, I would determine how it should be remedied in accordance with the Award.

​

Equally, if concerns arose during construction about compliance with the Award, I would consider those concerns and, where appropriate, give further directions or determine the issue in accordance with my statutory role.